QC Outsourcing Services

INTERCON, establish all quality control system started at material receiving until the final acceptance test.

  1. Preparing of NDT procedures
  2. Performing the NDT's and reporting.
  3. Preparing and carrying out of weld logs. Isometrics checking,
  4. Preparing and checking of test packs,
  5. Supervision and inspection of final acceptance tests, including performance, pynomatic and Hydrostatic tests.